Preparing for the lifting of the first of the 4 wells that made up the monlite of the pit 7.1
Start of removal of the first of the 4 wells
Removal of the first of the 4 wells
Removal of the first of the 4 wells of which the monolith was composed - the phase of overturning
The interior of the pit 7.1 after the extraction of the first of the 4 wells that made up the monolith
Monolith encapsulation
Positioning of the horizontal cutting machine
Testing of cutting machines 1 and 2
Rotondella ITREC Plant, Reclamation works of pit 7.1: the ‘monolith’ is ready to be cut and removed
The monolith during the reclamation of the pit 7.1
Rotondella ITREC Plant – Reclamation works in pit 7.1