Interim storage facility 9.1
- Maximum storage capacity: 2.100 cubic metres of radioactive waste
- Amount of stored waste: 142 cubic metres
- Type of stored waste: Very Low-Level Waste (114 cubic metres) and Low Level Waste (28 cubic metres)
Interim storage facility 9.2- Maximum storage capacity: 2.100 cubic metres of radioactive waste
- Amount of stored waste: 395 cubic metres
- Type of stored waste: Very Low-Level Waste
Interim storage facility 9.3
- Maximum storage capacity: 811 cubic metres of radioactive waste
- Amount of stored waste: 163 cubic metres
- Type of stored waste: Intermediate Level Waste
Interim storage facility 9.4
- Maximum storage capacity: 2.400 cubic metres of radioactive waste
- Amount of stored waste: 416 cubic metres
- Type of stored waste: Very Low-Level Waste (390 cubic metres) and Low
Level Waste (26 cubic metres)
Interim storage facility 9.5
- Maximum storage capacity: 2.400 cubic metres of radioactive waste
- Amount of stored waste: 280 cubic metres
- Type of stored waste: Very Low-Level Waste (65 cubic metres) and Low
Level Waste (215 cubic metres)
TMT
- Maximum storage capacity: 1.600 cubic metres of radioactive waste
- Amount of stored waste: 433 cubic metres
- Type of stored waste: Very Low-Level Waste
Other buffer for interim storage
- Amount of stored waste: 1.386 cubic metres
- Type of stored waste: Very Low-Level Waste (1.312 cubic metres); Low
Level Waste (16 cubic metres); Intermediate Level Waste (58 cubic metres)
An additional interim storage facility will be built to store solid waste
resulting from cementation of the final product. The nitric-based
solution of the final product is currently stored in a tank within an
underground premise of the plant.