The new water supply system included the creation of a new shaft and new hydraulic works for underground water transportation to be used for industrial purposes within the plant – such as fire protection systems of the controlled area, plant washing operations.
The activities for the implementation of the new facility with the internal underground network were concluded and tested in 2017. This intervention aims at dismantle the raised storage tank.