The Fuel Production Plant was the heart of Bosco Marengo Plant. The facility, in fact, hosted the production of fuel tables.
Temporary Repository Premise B106
In 2015, a new reservoir was created; in 2018 works were initiated to connect the reservoir to the fireproofing system.
In the period 2012-2013, an extraordinary maintenance campaign was conducted on 611 overpacks containing radioactive waste resulted from the plant previous operations.
The plant activity resulted in the production of 390 220-litres tanks containing solid radioactive waste, in addition to 741 tanks resulted from the decommissioning operations of the period 2009-2018.